شركة الحفر العربية
Voho builds AI that answers your phones, reads every document you hold, watches your cameras and writes the paperwork, connected to the software and databases you already run, in Arabic and English. Below is what that would look like at Arabian Drilling Company (ADC): 6 demonstrations built by Voho from public knowledge of the sector, not a description of anything Arabian Drilling Company (ADC) runs today.
A drilling rig costs a fixed amount every day whether it is turning or not. Non productive time is the number the whole business is judged on, and it accumulates through decisions made at night by people who cannot reach the person who knows. Shortening that gap is worth more than almost anything else.
6 things it would do here. Open any one.
A rig call where the first fifteen minutes decide the cost.
Why this one matters
Stuck pipe resolved in hours is an inconvenience and resolved in days is a sidetrack. The difference is whether the right history reaches the driller before he commits to a course of action.
Caller
We have the string stuck at around 3,400 metres, taking weight but no rotation. Been working it twenty minutes.
These are demos of how AI would work at Arabian Drilling Company (ADC): Voho’s own work, built from public knowledge of the sector, unrequested, and without access to their systems, data or processes. Every name, account, reference and figure in them is invented. Nothing here describes what Arabian Drilling Company (ADC) runs today. We do not work with them and have not been asked, endorsed or appointed; company names identify the operating context and no logos or brand assets are used. If you are at Arabian Drilling Company (ADC), we will rebuild every one of these against your actual processes.
The harness · on the job
The channels above are the base answering the rig. These are the rig itself: the driller’s screen, the mud pump the derrickman is standing next to, and the permit the toolpusher has to sign at three in the morning.
Demonstrations built from public knowledge of how Arabian Drilling Company (ADC) works. Arabian Drilling Company (ADC) has not asked for this and does not run it.
01 · Drilling intelligence
The voice call above is the one after the pipe is stuck. This is the eleven minutes before it. The harness reads the rig’s own WITSML stream, compares it with the fleet’s offset wells, and tells the driller what it sees while there is still a decision to make. A rig day rate is the cost of getting this wrong.
Torque climbing and drag on connections up 30% over the last three stands, with ROP falling at constant WOB. Pack-off signature building at 3,140 m MD.
Suggested: back off WOB, circulate at full rate for two bottoms-up before the next connection, and stage the pipe. Rig 38 saw this signature in the same interval in March and worked free; rig 31 did not, and lost four days.
Evidence: WITSML log · rig 38 and rig 31 DDRs · fleet NPT record · driller and toolpusher decision
02 · Field capture
The derrickman does the pump inspection at the end of every tour and writes it up when he remembers. Here he says it into the radio at the pump: the fluid end, the liner, the pop-off, the pressure gauge. The findings are structured, the isolation is confirmed rather than assumed, and the work order goes to the rig’s maintenance system with the photographs on it.
Radio · Saudi Arabic
Inspection record
template · recognising…
Asset
—
Location
—
Isolation · LOTO
—
Findings
—
Photographs
requested
Record completes when the technician finishes talking.
03 · Permit to work
A welder on the mud pit walkway is the hot work permit every drilling contractor issues weekly and the one where a checklist filled in by habit does the damage. The harness fills it from what the rig supervisor says, asks for the gas readings at the pit by number, leaves the fire watch open because it was not confirmed, and holds the permit for the toolpusher. The agent prepares; the toolpusher authorises.
Radio · Saudi Arabic
Permit R42-PTW-0455
filling from the conversation
A control is ticked only when it was said. Nothing is ticked by default.
The permit reaches the area authority when the supervisor finishes.
What it is worth
Everything below is per rig, per month, so nothing depends on a fleet size we would have to guess at. Multiply by the rigs you run. Where an assumption is wrong, change it: the arithmetic is written out so you can.
What we assumed
What it plugs into
Engineer and base hours given back
12 calls x 38% x 11 min x 30 days
Report checking that stops being a person’s job
1 report x 6 min x 30 days
Time not spent hunting for the right document
3 lookups x 12 min x 30 days
Hours back per rig, every month
the three above, added up
One hour of non productive time avoided
USD 25,000 / 24 hours
The same hour, across a year
USD 1,040 x 12 months
The NPT line is deliberately one hour a month per rig, which is the conservative case rather than the sales case. It is also the line that moves most: a single avoided sidetrack is worth more than everything above it added together, and the stuck pipe scenario is exactly that call. These are illustrative figures for Arabian Drilling Company (ADC), built from public context and industry norms rather than their books, and they are meant to be argued with on a call.
Next step
Everything above was written from public information about Arabian Drilling Company (ADC), not from their systems. Pointed at your own calls, documents and records, the same 6 scenarios are a working deployment rather than a demonstration.
Bring your call volume, your average call length, and the one process that costs you most when it goes slowly. Forty five minutes with an engineer, in Arabic or English, is enough to say what it would take.
What we would build first, for a energy operation like this
Named for Arabian Drilling Company (ADC) because that is the page you are on. The shape holds across energy, which is the point of the library.